OVERPASS AUTOBAHN A8 WENDLINGEN-KIRCHHEIM
Project: New Bridge on Autobahn A8
Location: Kirchheim unter Teck, Germany
Date: July 2014
Client: PPP-Konsortium (Private-Public-Partnership)
Initial situation:
Within a PPP-Project the concessionaire planned the installation of humidity and corrosion sensors.
The objective of planning in the newly built area was to detect damage in the area of the caps and joints early enough before they appear. Because a very long warranty period has been agreed upon, it was necessary to observe the technologically-related vulnerabilities and the effectiveness of surface protection systems used over a very long period.
Solution:
CorroDec®2G
According to the damage occurring in the future in the field of technology-related vulnerabilities and the cap area, humidity and corrosion sensors had been installed.
Added value:
- Cost reduction in concrete repair
- Differentiated repair in case of failure of the OS
- Reduction of inspection costs
- Control of inspection intervals
- Reduced idle periods with later repairs
Initial situation:
Within a PPP-Project the concessionaire planned the installation of humidity and corrosion sensors.
The objective of planning in the newly built area was to detect damage in the area of the caps and joints early enough before they appear. Because a very long warranty period has been agreed upon, it was necessary to observe the technologically-related vulnerabilities and the effectiveness of surface protection systems used over a very long period.
Solution:
CorroDec®2G
According to the damage occurring in the future in the field of technology-related vulnerabilities and the cap area, humidity and corrosion sensors had been installed.
Added value:
- Cost reduction in concrete repair
- Differentiated repair in case of failure of the OS
- Reduction of inspection costs
- Control of inspection intervals
- Reduced idle periods with later repairs