Conceptual Estimating

Design assist and value engineering

Project scheduling and logistic plan

Conceptual Estimating

A conceptual estimate is a preliminary estimate. It is the first serious effort made to predict the cost of the project. A conceptual estimate is usually performed as part of the project feasibility analysis at the beginning of the project. In this way, the estimate is made with limited information on project scope, and is usually made without detailed design and engineering data. The conceptual estimate is also defined as approximate estimate and used to know the budget for a project. Considerable experience and judgment are required to obtain a dependable approximate estimate for the cost.

Design assist and value engineering

Design assist and value engineering to identify alternate materials and methods for cost-effectiveness

Project scheduling and logistic plan

Preconstruction phase schedule management is one of the key roles of the preconstruction manager. Creating a realistic and detailed schedule for all design, approval, estimating and purchasing activities to ensure that construction activities begin on schedule is the primary objective of our preconstruction schedule.

Discover our Case Studies


Here is a selection of our references.

REQUEST A QUOTE

CLIENTS THAT TRUST


    Product
    • Corrosion & humidity sensor for buildings - CorroDec2G

    • Wireless universal monitoring for buildings - ZERBERUSWSS

    • Crack monitoring with sensors - Rissmon